By Dream Assurance Group · Reviewed by Kevin Morrissy
Builder’s risk coverage starts on the policy’s effective date, which should be no later than the day the first materials are delivered to the site, and ends at the earliest of four events: the expiration date, completion and acceptance of the work, the building being occupied or put to its intended use, or the permanent property policy taking over. Expiration is the date people watch, but occupancy is the one that ends coverage early and by surprise. A project that runs long needs an extension bound before expiration, priced pro rata to the original rate.
When does builder’s risk coverage start?
On the effective date shown on the declarations page, and the right effective date is the first day there is something on the site to lose. Builder’s risk insurance covers the structure, materials and supplies destined for the project, so the trigger is not the groundbreaking; it is the first of these:
- Materials delivered. Lumber, trusses, windows or mechanical equipment dropped at the site are covered property from the moment they arrive. A pallet of windows stolen the night before the policy starts is an uninsured loss.
- Mobilization. Fencing, a job trailer, temporary power and scaffolding are covered temporary structures on most forms, but only inside the policy period.
- Demolition on a renovation, where the existing structure may also be on the policy.
- The lender’s first draw, which usually cannot fund until the lender has the policy or a certificate.
Bind before mobilization. Starting a week early costs a few days of premium; starting a week late can cost the first delivery. Coverage is never retroactive, and most forms require you to disclose any work done before the effective date, because that value was never underwritten. The dates on a certificate of insurance are evidence a policy was issued; the declarations page controls when coverage applies.
When does builder’s risk coverage end?
At the earliest of the events listed in the policy, not at the expiration date alone. The standard builders risk form ends coverage when the first of these happens:
- The policy expires or is cancelled.
- The work is completed and accepted by the owner. Final completion on most forms, substantial completion on some, so check which.
- The building is occupied or put to its intended use, in whole or in part, unless the policy permits it.
- The insured’s interest ends, for example when a spec home closes and the buyer’s homeowners policy takes over.
- Permanent property insurance takes effect on the building.
Some forms add a tail: coverage continues 30, 60 or 90 days after completion or until occupancy, whichever is first, so a finished building waiting for a tenant or a closing is not uninsured. If your project will sit finished and empty, ask for that wording; if the form lacks it, the permanent policy must be bound on the completion date.
Does occupancy end builder’s risk coverage?
Yes, and it is the trigger that catches owners out. On the standard form, occupying the building or using it for its intended purpose ends coverage, and on many forms partial occupancy ends coverage on the whole project, not just the occupied part. The usual cases: a tenant moves into the finished first floor while the upper floors are fitted out, the owners of a custom home move in before the punch list is done, or a model home opens for sales traffic.
The fix is a permission to occupy endorsement, in which the insurer agrees in advance to a described partial occupancy and keeps the rest of the project covered. Ask for it when the schedule shows phased turnover, before the first tenant gets keys. Renovations of occupied buildings start occupied and stay occupied, so those policies are written to allow it from day one; see our post on builder’s risk for renovations.
What happens when the project runs past the expiration date?
The policy expires and the project is uninsured until an extension or a new policy is bound; nothing in the standard form extends coverage because the building is not finished. Delays are the rule in construction, so the procedure matters:
- Ask 30 to 45 days before expiration. The insurer wants the percentage complete, the revised completion date, any change in insured value and the loss history. A request in the final week may not bind in time.
- Expect pro rata pricing. Extensions are typically charged at the original rate for the added months, sometimes plus a flat fee. A project far behind schedule or one that has had a loss may be re-underwritten and re-priced, and some insurers cap total extensions.
- Update the limit if change orders have pushed the contract sum up; the exposure is highest at the end.
- Tell the lender. Loan agreements require coverage through completion; an expired policy stops draws.
Buying 30 to 60 days of cushion up front is cheaper than extending later and avoids a lapse. Our builder’s risk cost guide covers how term length and extensions affect premium.
How long should the builder’s risk policy term be?
The construction schedule plus a cushion. Single-project policies are written for 3 to 12 months and extended as needed; a custom home typically runs 9 to 12 months and a mid-size commercial building 12 to 18, so the commercial project is written for 12 months with a planned extension or for 18 from the start. Builders with several homes going at once use an annual reporting or blanket policy, where each house is covered from start to sale within the policy year. Our guide to commercial builder’s risk covers completed-value and reporting forms.
What happens between completion and the permanent policy?
The permanent property policy should take effect the day builder’s risk ends, so choose the two dates together: bind the permanent policy effective on the certificate of occupancy or acceptance date and cancel builder’s risk the same day, with a pro rata refund of unused premium. On a spec home the buyer’s homeowners policy starts at closing, when the builder’s interest ends. A building finished in March and leased in June needs the post-completion tail or a permanent policy from March.
What should you confirm before the policy is bound?
- The effective date is on or before the first delivery or mobilization, the application discloses any work already done, and the expiration date is scheduled completion plus 30 to 60 days.
- Whether the form ends at substantial or final completion, and whether it carries a 30, 60 or 90-day post-completion tail.
- Whether any part of the building will be occupied before final completion, and if so that a permission-to-occupy endorsement is included.
- What the policy covers during the term; our guide to builder’s risk coverage and exclusions lists what is in and out.
Who manages these dates depends on who bought the policy; our post on who buys builder’s risk insurance explains the owner, contractor and lender roles.
Get a builder’s risk policy that matches your schedule
We write builder’s risk terms to the construction schedule with a cushion, add permission-to-occupy wording when turnover is phased, and calendar the extension and the permanent policy so neither date is missed. Request a quote with the start date, projected completion date and project value. Dream Assurance Group is an independent agency in Overland Park, Kansas, licensed in 36 states. Email info@dreamassurancegroup.com with questions.
Frequently asked questions
When does builder’s risk coverage start?
On the effective date shown on the declarations page, which should be no later than the first day materials, equipment or temporary structures are on the site. Coverage is not retroactive: a loss before the effective date is uninsured even if the policy is bound the next day. Bind the policy before mobilization and tell the insurer if any work has already been done, because the standard form requires that disclosure and the underwriter prices the term from the effective date.
When does builder’s risk coverage end?
At the earliest of the policy’s expiration or cancellation, completion and acceptance of the work, the building being occupied or put to its intended use, the insured’s interest ending (such as the sale of a spec home), or permanent property insurance taking effect. Some forms add a tail that continues coverage 30, 60 or 90 days after completion or until occupancy, whichever is first. Expiration is the date everyone watches; occupancy is the one that ends coverage early.
Does builder’s risk end at completion or at occupancy?
Whichever comes first. On the standard form, occupancy or use of the building for its intended purpose ends coverage even if punch-list work remains, and on many forms partial occupancy ends coverage for the whole project. Completion means final completion and acceptance on most forms, substantial completion on some. If part of the building will be occupied before the rest is finished, add a permission-to-occupy endorsement before the first tenant or owner moves in.
Can builder’s risk insurance be extended if the project is delayed?
Yes, if you ask before the expiration date. Insurers typically extend at the original rate pro rata for the added months, sometimes with a flat fee, after reviewing the percentage complete, the new completion date, any change in value and the loss history. A project far behind schedule or one that has had a claim may be re-underwritten and re-priced, and some insurers cap total extensions. Request the extension 30 to 45 days ahead so it binds before the lapse.
How long does a builder’s risk policy last?
As long as the term you buy, typically 3 to 12 months for a single project, with extensions available. A custom home usually needs 9 to 12 months, a mid-size commercial building 12 to 18, and the term should be the scheduled completion date plus 30 to 60 days of cushion. Builders with several homes under way use an annual reporting or blanket policy that covers each start from mobilization to sale inside the policy year.